MRP Engineer

Job Title:MRP Engineer
Experience:3 to 5
Education:Bachelor’s Degree
Location:Egypt, Giza
Category:Engineering – Oil & Gas/Energy
Description:
  • Ensure that material scheduling strategy and processes are in place and work effectively
  • Manage inventory risk and ensure that contingency plans are in place
  • Ensure that any Material Requirements Planning system (MRP) or IT system in place is effective and that data is accurate and up to date and resolve any issues as required
  • Perform daily analysis to predict potential inventory problems.
  • Schedule the supply of materials/components to meet operation (Projects ) requirements and minimum safety stock levels
  • Plan, develop, implement and evaluate processes for material delivery from supplier to point of fit
  • Monitor inventory levels against agreed target levels
  • Link between different departments regarding raw materials
  • Reducing the inventory rate
  • Control and reduce OSMI (Obsolete & Slow Moving Inventory )
Qualifications:
  • Prefer working in same industry oil & gasĀ 
  • Exp 3-5 years
  • Good knowledge of ERP System
Contact:

Collected from:

Posted in Engineering - Oil & Gas/Energy